Non-repayable funding for digitalizing your company: the real 2026 picture

The most quoted figure on this subject belongs to closed calls. Below: what is open today, what is only announced, what awaits a budget and what can no longer be submitted.

Northdan Soft is a software supplier, not a funding consultancy, and is not affiliated with any managing authority or development agency. Programme information is indicative — always check the conditions in the programme's official applicant guide.

The EUR 20,000–100,000 band, still presented on many pages as the current digitalization grant, belongs to no open call. The figure comes from the PNRR C9 I3.1 SME digitalization call, which took applications between 15 February and 30 June 2023 and has not reopened. Two further closed documents keep the confusion alive with nearby figures: a draft guide put into public consultation on 4 October 2022, and a de minimis scheme from the 2014-2020 cycle whose eligibility text refers to applications filed during 2021. What is open now at national level: SME Eco-Tech, with registrations until 24 September 2026 at 20:00, a grant of at most 40% of eligible costs, capped at CHF 50,000 — RON 267,240 — but conditional on a bank loan covering at least 60% of the investment. POCIDIF Action 2.1 is also open, until 30 September 2026, but exclusively for SMEs with ICT CAEN codes developing an innovative software product, with a floor of EUR 200,000 per project. Checked on 30 July 2026. Northdan Soft is the software supplier inside the project, not the funding consultant.

Let’s talk about your project

Message us on WhatsApp or send an email — you talk directly to a developer.

office@northdan.com · +40 752 070 247

How we help

An honest map of statuses, not a list of hopes

We separate what is open from what is announced, budget-conditional or closed in implementation, so your planning does not start from a call that no longer exists.

A budget built on the guide's own categories

We use the cost names from the host programme's guide rather than an invented structure, so evaluation and settlement do not force a rebuild of the budget.

One supplier for the whole digital mix

Website, online store, management software, integrations and automation from the same team means fewer contracts to track and one delivery schedule in the project.

A delivery deadline committed by contract

The schedule in the draft contract is aligned with the project's implementation period, and interim acceptance is planned before the payment window.

Why figures from closed calls still circulate

The explanation is simple and checkable: the pages publishing them were never updated after the calls closed, and some date themselves. You can still find material announcing a programme as open with a 2023 window, eligibility text requiring incorporation by 31 December 2021, or 2025 headlines over schemes from the previous financial cycle. The practical rule for a reader: if a page states an amount without also stating the call's opening and closing dates, treat the amount as historical until proven otherwise.

The same caution applies to regional ceilings. The digitalization lines run by the regional development agencies have different ceilings from one region to another, and a figure read for one region does not transfer to another. This is not a subtlety: some material displays three different regional ceilings for the same topic on one page, without saying to whom each applies.

What is open, what is announced, what is closed

Open: SME Eco-Tech, with the deadline and ceilings given above. Through the order published in Monitorul Oficial no. 558 of 7 July 2026 the programme is no longer restricted to manufacturing — trade and services companies and micro-enterprises become eligible too. The minimum project value is RON 668,100 in eligible costs, and the loan contracted with a partner bank must be at least RON 400,860.

Open, but narrowly addressed: POCIDIF Action 2.1, until 30 September 2026 at 17:00, for SMEs with ICT CAEN codes developing an innovative software product for commercialisation. It is not an internal digitalization call and does not suit a company that wants to buy an ERP.

Announced, without dates: Start-Up Nation session 2, with up to RON 250,000 and spending allowed until 8 December 2027. Conditional on the adoption of the 2026 MEDAT budget: Microindustrializare and Comerț — the allocations circulating publicly are proposals, not commitments. In the payment phase rather than the registration phase: Femeia Antreprenor.

Closed but still relevant: the PNRR C9 SME digitalization call, closed since 2023. Contracted beneficiaries have completion deadlines on 30 June and 31 July 2026, and payments run until 30 October 2026. For them the question is no longer how to apply but how to deliver and have it accepted on time.

A grant, a guaranteed loan and non-financial aid are not the same thing

Many lists mix three different instruments under one heading, and the difference changes a company's financial plan completely. A grant is non-repayable money, with co-financing and durability obligations. A guaranteed credit instrument means a loan you repay, with a state guarantee or interest subsidy. Non-financial aid, such as the support received through European Digital Innovation Hubs, means services granted under a contract rather than money in the account — and there the applicant to the call is the hub, not the company.

SME Eco-Tech is the clear example of a mixed instrument: the grant of at most 40% works only together with a bank loan of at least 60%. A company budgeting as if it were receiving a clean grant discovers the credit condition at the bank, that is, too late to correct it in the file.

What can actually be bought, and who does what in the file

The broad list of digital categories — presentation website, e-commerce, ERP and CRM, licences, cloud services, automation, cybersecurity, electronic signature, training — comes from the PNRR C9 call and remains a good reference for what a complete digitalization mix looks like. It is not, however, a menu available today: every open programme has its own list and its own per-category ceilings. In SME Eco-Tech, for instance, the software needed to run the business is eligible up to RON 15,000 excluding VAT, per the implementation procedure.

Splitting the roles matters as much as the cost list. The consultant writes and submits the application and answers clarification requests. The software supplier delivers the technical offer, the budget by category, the draft contract, then the implementation and the acceptance documents. The company defines the scope, provides the co-financing and owns the indicators. Overlapping these roles is a real risk: several programmes check whether price offers come from the entity that produced the submission documentation, and suspicion of an accommodation offer is penalised.

Indicatively, digitalizing a small company sits in three bands: EUR 1,000–5,000 for online presence, EUR 5,000–25,000 for internal processes and above EUR 25,000 for integrated flows. The figures are indicative, move with the number of connected systems and the volume of migrated data, and the firm estimate comes in writing after analysis.

What we do not do

We do not write the funding application, we do not submit files, we do not promise approval and we issue no eligibility verdicts for your company. We do not sell call calendars the authority has not published.

The limit that costs us: if the available budget does not justify the solution you asked for, we say so before the offer, even when that means a smaller contract or none at all. And we issue no accommodation offers for anyone's file — an offer of ours describes something we can deliver at the price written in it.

Frequently asked questions

Does the EUR 20,000–100,000 digitalization grant still exist?

Not as an open call. It is the ceiling of the PNRR C9 I3.1 call, which took applications between 15 February and 30 June 2023; circulating alongside it are a draft guide from 4 October 2022 and a de minimis scheme from 2014-2020 keyed to the year 2021. The programmes open in 2026 have different thresholds: SME Eco-Tech caps the grant at CHF 50,000, and POCIDIF Action 2.1 starts at EUR 200,000.

Is there a call open right now for any SME that wants to digitalize?

Not a generalist one. SME Eco-Tech is open but requires a bank loan of at least 60% of the investment and a floor of RON 668,100 in eligible costs. POCIDIF Action 2.1 is open but only for companies with ICT CAEN codes developing a software product to sell. The remaining routes are announced, budget-conditional or regional.

How do I check for myself whether information about a call is current?

Look for three elements on the page publishing it: the call's opening and closing dates, the legal act approving the guide, and the date of the last update. If two are missing, treat the information as unconfirmed and go to the programme's official source. A year in a headline is not evidence of currency.

What does it mean that a programme is budget-conditional?

That its launch depends on the adoption of the coordinating ministry's budget allocation for the current year. Until adoption, any amount and any submission date circulating are proposals. This period can be used well for the technical specification and the business plan, but a submission date cannot be planned.

I hold a PNRR C9 contract and will not finish on time. What can be done?

The published deadlines are 30 June and 31 July 2026 for completion and 30 October 2026 for payments, and extensions are decided by the authority, not by the supplier. In practice the only lever left at supplier level is reducing the scope to what can be delivered and accepted within the remaining window, with complete documentation.

Packages for this programme

Services for the software component

Similar pages

Related resources

Let’s talk about your project

Message us on WhatsApp or send an email — you talk directly to a developer.

office@northdan.com · +40 752 070 247