IT startups: which EU funds you can take in 2026, and on what conditions
The first check is not the amount but the authorised CAEN code. Without it the file is rejected automatically at contracting, however good the product described in the application.
The CAEN code is the gate, not the formality. The POCIDIF Action 2.1 guide, approved by MIPE Order no. 965 of 23 June 2026, requires the applicant to have authorised, at the date the application is submitted, the activities on the mandatory list: 2611, 2612, 2630, 5821, 5829, 6210, 6220, 6290 and 6310. If those codes are not authorised, the project is rejected automatically at the contracting stage, without any request for clarification. The second check is the threshold: a minimum of EUR 200,000 in non-repayable aid per project and a maximum of EUR 1,500,000 where the result is an innovative software solution. Submission is open from 30 June 2026 at 15:00 until 30 September 2026 at 17:00. For founders before that stage, the route is Start-Up Nation session 2, announced by MEDAT with up to RON 250,000 and spending allowed until 8 December 2027, with no submission dates published. Checked on 30 July 2026 against the approved guide.
Let’s talk about your project
Message us on WhatsApp or send an email — you talk directly to a developer.
office@northdan.com · +40 752 070 247
How we help
A product roadmap translated for evaluators
We turn the backlog into stages, deliverables and measurable indicators — the language an innovation dossier is read in, not the one in your task tracker.
Architecture described, not promised
Components, interfaces, data, external dependencies and technical risks, at a level of detail that survives clarification requests and ties line by line to the budget.
A development team for the project's peaks
We cover by contract the stages the internal team cannot carry, within the limits the guide places on outsourcing — explained before signature, not after.
Estimates that survive the market check
Component costs come from delivered projects and from our dated public price guides, so every budget line has a verifiable anchor behind it.
The gate: the CAEN codes as the guide lists them
The mandatory list covers both electronics manufacturing — 2611 manufacture of other electronic components, 2612 manufacture of loaded electronic boards, 2630 manufacture of communication equipment — and software proper: 5821 publishing of computer games, 5829 other software publishing, 6210 computer programming activities, 6220 computer consultancy activities, 6290 other information technology services and 6310 data processing and web page administration. The codes are those of the revised CAEN nomenclature, not the older one.
Beware of a confusion that circulates and can cost an entire file: the same code families appear, in other SME digitalization programmes, on an exclusion list. In POCIDIF Action 2.1 they are the requirement, not the prohibition. Never move a code list from one programme's page to another's — two calls can hold exactly opposite rules for the same numbers.
The real ceiling for a software result
The figure circulating most on this subject, EUR 3,000,000, is not the ceiling of a software project. It applies to projects whose result is an innovative hardware product manufactured by the beneficiary, and the part above EUR 1,500,000 must be justified by financing the production line. For an application, a service or a platform the ceiling is EUR 1,500,000. A startup budgeting from three million mis-sizes its project on day one.
The guide also sets tiers for aid granted to newly established enterprises: EUR 750,000 in the more developed region, EUR 1,000,000 in the less developed regions and up to EUR 1,500,000 for innovative newly established enterprises, in all cases within the maximum per-project ceilings. The call allocation is EUR 48,813,278 from ERDF and the state budget.
What an external supplier cannot do in your project
The guide explicitly forbids outsourcing all technical activities. The beneficiary must demonstrate direct involvement and its own coordination capacity, and the non-repayable aid allocated to technical activity carried out by its own staff must represent at least 20% of the aid allocated to the core activity. The implementation team must also include at least one technical coordinator and two technical experts qualified and experienced in the project's field.
The consequence for a small startup team is direct: we cannot be contracted as your entire technical team. We can cover components, stages or peaks, but the technical core must stay with you, and those people must exist at submission rather than in intention. We say so before signing, because it is the only version in which the contract survives verification.
The guide also carries a rule that bears directly on the supplier–consultant relationship: costs where there is suspicion of accommodation offers between the applicant and the companies that issued offers, or those that produced the documentation for submitting the project, are treated as ineligible and the project scores zero on that sub-criterion. The offering company's field of activity is checked against what it offered. Separating whoever writes the dossier from whoever delivers the software is not our preference; it is a requirement of the call.
What must be proven at the end, and how it is scored
The call's indicators are few and sharp: one innovative product, application or service delivered, and three proofs of commercialisation. The proofs can be concluded contracts or invoices; proforma invoices and agreements do not count as proof of commercialisation. To these is added investment performance, which must exceed 0.5, calculated as direct and indirect revenue from the developed product divided by its development costs, measured at the end of the three-year durability period.
On scoring, approval requires a minimum of 70 points; below that, projects are rejected. The excellence threshold is 92 points, and projects reaching it enter contracting in submission order up to 50% of the call allocation. For a very strong project, in other words, the submission date decides the place in the queue. The grid also penalises two things you control from the budget: a hardware share above 20% of total eligible value on software-result projects, and costs declared ineligible at evaluation above 15% of those requested — both score zero on the budget criterion.
Alternative routes when POCIDIF does not fit
Start-Up Nation session 2 plays in another league: smaller sums, but accessible to freshly incorporated companies, with a business plan instead of an innovative-product dossier. The current period, with no submission dates published, is useful precisely because it allows the digital chapter to be built on real specifications and costs rather than hearsay estimates.
An eligibility warning that is rarely written down: the EDIH network is not a call a company applies to. The applicant is the hub, and the company receives support through the hub in the form of non-financial state aid granted under a contract — services, testing, digital maturity assessment, not money in the account. Any page inviting you to submit a project to an EDIH describes the mechanism incorrectly.
Northdan Soft's role and its limits
We are not funding consultants and we do not submit files. We deliver the technical component the evaluation reads: specifications, architecture, development schedule, a budget by eligible cost category and a draft contract conditional on obtaining the funding. In execution we can act as an external team on components, within the limits described above.
We promise no scores, we issue no eligibility verdicts and we do not write the application. If the product you want to budget cannot reach the call's indicators within the implementation period, we say so before submission — including when that means we do not sign the contract.
Frequently asked questions
Can a freshly incorporated startup apply to POCIDIF Action 2.1?
It can, if it has authorised at least one of the required CAEN codes and can sustain a project of at least EUR 200,000 in non-repayable aid, with co-financing and an implementation team including a technical coordinator and two technical experts. The guide provides dedicated tiers for newly established enterprises, up to EUR 1,500,000 for innovative ones. The full conditions are read in the approved guide.
Can I pay for outsourced product development from the grant?
Partly. The guide allows contracting specialised services from third parties but forbids outsourcing all technical activities and requires at least 20% of the aid allocated to the core activity to go to the beneficiary's own staff. Plan from the start what stays in-house, because this ratio is verified rather than declared.
What is the scoring threshold for approval?
A minimum of 70 points. Below that, projects are rejected from funding. The excellence threshold is 92 points and leads directly into contracting, in submission order, up to 50% of the call allocation. The figure of 60 points that still appears in online material does not occur in the guide approved by MIPE Order no. 965 of 23 June 2026.
What do the three proofs of commercialisation mean?
They are the indicator showing the product actually reached the market and can be evidenced through concluded contracts or invoices. The guide explicitly excludes proforma invoices and agreements. Our technical recommendation: design the sales and invoicing flow in the first sprints, so the proofs exist naturally at the end of implementation rather than being hunted in the last month.
Where do I find the applicant guide and its amendments?
On the website of the Ministry of Investments and European Projects, in the POCIDIF guides section, where the approved guide, its annexes and the clarification notes are published. The managing authority issues clarifications on annexes periodically — the latest such note on Action 2.1 appeared on 28 July 2026 and concerned the expert's declaration of independence. Check the annexes before submitting.
How long does implementation last on this call?
The maximum implementation period is 24 months, extendable but no later than 31 December 2029. The 12- or 18-month figure appearing in some online presentations does not match the approved guide. Our development schedule is built on the real duration from the guide, with interim acceptance milestones.
Packages for this programme
Services for the software component